梯级水库群超标洪水的协同应急调度研究
详细信息    查看全文 | 推荐本文 |
  • 英文篇名:Research on collaborative emergency dispatch of the excessive flood of cascade reservoirs
  • 作者:岳华 ; 马光文 ; 杨庚鑫
  • 英文作者:YUE Hua;MA Guangwen;YANG Gengxin;State Key Laboratory of Hydraulics and Mountain River Engineering,College of Water Resource & Hydropower,Sichuan University;Guodian Dadu River Hydropower Development Co.,Ltd.;
  • 关键词:梯级水库群 ; 超标洪水 ; 最高水位最低化准则 ; 协同应急调度
  • 英文关键词:cascade reservoirs;;excessive flood;;maximum water level minimization criteria;;collaborative emergency dispatching
  • 中文刊名:SLXB
  • 英文刊名:Journal of Hydraulic Engineering
  • 机构:四川大学水力学与山区河流开发保护国家重点实验室水利水电学院;国电大渡河水电开发有限公司;
  • 出版日期:2019-03-15
  • 出版单位:水利学报
  • 年:2019
  • 期:v.50;No.510
  • 基金:国家重点研发计划项目(2016YFC0402205-6)
  • 语种:中文;
  • 页:SLXB201903008
  • 页数:8
  • CN:03
  • ISSN:11-1882/TV
  • 分类号:78-85
摘要
受全球气候变暖影响,极端天气事件发生频次增加,超标准洪水灾害的突发性、危害性和不可预见性更加突出,使得梯级水库面临的应急处置问题日益凸显,其中大坝溃决或连溃是梯级水库面临的最大威胁。针对超标洪水,实施水库群协同应急调度,是发挥水库综合利用效益的有效手段之一。本文选取最高水位最低化准则作为超标洪水协同应急调度模型的目标函数,采用逐步优化算法求解梯级水库群超标洪水协同应急调度模型,对梯级水库群超标洪水应急调度方案进行了有益的探索,并以大渡河流域瀑布沟水库、深溪沟水库和枕头坝一级水库为例,对其超标洪水过程进行调度计算,验证了上述模型的合理性和可靠性。结果表明:通过梯级水库群的协同应急调度,各水库在洪水前期预泄水库水量,尽可能腾出更多的水库库容,便于迎接后期可能发生的洪水,尽可能地降低各水库的水位,有效确保梯级水库群的防洪安全。研究成果对各大流域梯级水库群超标洪水的应急调度机制的建立具有重要的理论意义和工程实践价值。
        Due to the impact of global climate changing,the frequency of extreme weather events has increased significantly. The suddenness, harmfulness and unpredictability of the excessive floods are more prominent,posing a great challenge to the collaborative emergency dispatch and the safety of cascade reservoirs. And the dam break or even continuous collapse is the biggest threat to the cascade reservoir. In response to the excessive flooding,it is one of the effective means to realize the comprehensive utilization efficiency of reservoirs to carry out emergency dispatch of cascade reservoirs. In this paper,the maximum water level minimization criteria is selected as the objective function of the collaborative emergency dispatching model for excessive flood,and the Progress Optimality Algorithm method is used to solve the model.Taking the Pubugou Reservoir,the Shenxigou Reservoir and the Zhentouba-I Reservoir in the Dadu River Basin as an example,an emergency dispatching plan for the excessive flood of the cascaded reservoirs in this basin is proposed,the process of its exceeding flood control is calculated. The rationality and reliability of the above model are verified. The results indicate that through the collaborative emergency dispatching of cascade reservoirs,each reservoir will pre-discharge the water in the pre-flood stage,freeing up more reservoir storage capacity,facilitate to meet the possible flood in the later stage,reduce the water level of each reservoir as much as possible,and effectively ensure the flood control safety of cascade reservoirs. The research results have important theoretical significance and engineering practical value for the establishment of emergency dispatch mechanism for the excessive flood of cascade reservoirs in major river basins.
引文
[1]何向阳,周和清,宋应玉,等.水库大坝突发事件预警与应急处置系统研究与开发[C]//中国水利学会年会论文集,2016.
    [2]彭雪辉,等.中国水库大坝风险标准研究[M].北京:中国水利水电出版社,2015.
    [3]李致远.梯级水库的联合防洪调度及防洪风险分析[J].吉林水利,2015(7):39-41.
    [4]何鲜峰,全逸峰.大坝运行风险评价理论及应用[M].郑州:黄河水利出版社,2014.
    [5]张锐.梯级水库群漫坝失事风险分析及其应急处置研究[D].大连:大连理工大学,2016.
    [6]钟平安.水库防洪优化调度目标函数分析[J].水利经济,1995(1):38-44.
    [7]郭生练,陈炯宏,刘攀,等.水库群联合优化调度研究进展与展望[J].水科学进展,2010,21(4):496-503.
    [8]肖琳.水库群防洪优化调度模型及算法研究[D].郑州:华北水利水电学院,2008.
    [9]周超,王红卫,江兴稳.流域水系突发事件演化分析及水库应急调度响应[J].水电能源科学,2014,32(10):43-47,25.
    [10]贾本有,钟平安,陈娟,等.复杂防洪系统联合优化调度模型[J].水科学进展,2015,26(4):560-571.
    [11]钟平安.流域实时防洪调度关键技术研究与应用[D].南京:河海大学,2006.
    [12] CHEN S J,YAN S,HUANG W B,et al. A method for optimal floodgate operation in cascade reservoirs[J]. Pro?ceedings of the Institution of Civil Engineers-Water Management,2017,170(2):81-92.
    [13]钱镜林,张松达,夏梦河.逐次优化算法在梯级水库防洪优化调度中的应用[J].中国农村水利水电,2014(8):22-25.
    [14]陆承璇,方诗圣.基于遗传算法的水库防洪优化调度研究[J].中国水运,2016,16(8):110-111.
    [15]邹强,王学敏,李安强,等.基于并行混沌量子粒子群算法的梯级水库群防洪优化调度研究[J].水利学报,2016,47(8):967-976.
    [16] WANG J L,HUANG W B,MA G W,et al. An improved partheno genetic algorithm for multi-objective econom?ic dispatch in cascaded hydropower systems[J]. International Journal of Electrical Power&Energy Systems.2015,67:591-597.
    [17]马光文,刘金焕,李菊根.流域梯级水电站群联合优化运行[M].北京:中国电力出版社,2008.