亿千瓦级时代中国水电调度问题及其进展
详细信息    查看全文 | 推荐本文 |
  • 英文篇名:A state-of-the-art review of China's hydropower operations and the recent advances in the era of gigawatts
  • 作者:程春田 ; 武新宇 ; 申建建 ; 李刚 ; 廖胜利 ; 刘本希
  • 英文作者:CHENG Chuntian;WU Xinyu;SHEN Jianjian;LI Gang;LIAO Shengli;LIU Benxi;Institute of Hydropower & Hydroinformatics,Dalian University of Technology;
  • 关键词:西电东送工程 ; 干流梯级水电站群 ; 特高压直流水电输送 ; 跨流域梯级水电站群 ; 跨区域协调
  • 英文关键词:power transmission project from west to east;;main stream cascade hydropower station group;;UHV direct hydropower transmission;;interbasin cascade hydropower stations;;cross regional coordination
  • 中文刊名:SLXB
  • 英文刊名:Journal of Hydraulic Engineering
  • 机构:大连理工大学水电与水信息研究所;
  • 出版日期:2019-01-15
  • 出版单位:水利学报
  • 年:2019
  • 期:v.50;No.508
  • 基金:国家自然科学基金重大计划重点支持项目(91547201)
  • 语种:中文;
  • 页:SLXB201901012
  • 页数:12
  • CN:01
  • ISSN:11-1882/TV
  • 分类号:116-127
摘要
三峡工程和西电东送工程开启了中国和世界水电史上从未有过的最大规模水电工程建设,中国水电取得了1亿千瓦、2亿千瓦和3亿千瓦里程碑成就。截至2017底,中国水电装机容量达到了3.41亿kW,是排名第2美国3倍多,等同于紧随其后世界5个水电大国总和。中国水电区域电网水电装机规模超过1亿kW,有两个省级电网水电装机规模分别超过了7000万kW、6000万kW,超过排名第5的日本,紧随排名第4的加拿大;十四大水电基地中,有7个干流梯级水电装机容量超过了1000万kW,最大金沙江流域超过了3000万kW;西电东送"南通道"和"中通道"20条特高压直流和8条特高压交流跨省跨区域水电输送能力1.05亿kW。中国水电史无前例的系统规模和发展速度,极大改变了国内外现有的调度管理方式,对传统的水电系统调度方法提出了重大挑战,需要全新的调度方法。本文概述了中国水电发展历程,总结了水电系统新变化和面临的三大水电问题,梳理了最近10多年中国水电突出的理论和方法进展,最后指出未来需要开展能源结构转型中的中国水电问题研究。
        The Three Gorges and West-East Electricity Transfer Projects have brought an unprecedented hydropower boom in China and the world. China's cumulative installed hydropower capacity has been over100 GW,200 GW and 300 GW in just 20 years. By the end of 2017,the installed hydropower capacityin China has reached 341 GW, which is more than three times of installed hydropower capacity in theUnited States,the second largest in the world,and equivalent to the combined installed hydropower capaci?ty of the world's next five major hydropower countries. In the process of rapid development of hydropowerin China,it is also the period of speedy development of the entire China's electricity system. By hydropow?er interconnection, the installed capacity of single regional power grid is more than 100 GW, which ishigher than the United States and Brazil,which rank second and third in the world. Two provincial powergrids have been built with more than 70 GW and 60 GW of installed hydropower capacity,respectively,ahead of fifth-placed Japan and following the fourth-placed Canada. The unprecedented scale and develop?ing speed of hydropower system in China has greatly changed the existing scheduling management methodsat home and abroad,posing a major challenge to the traditional scheduling methods of hydropower system,and a new scheduling method is needed. This paper gives an overview of the development history of hydro?power in China,concludes the new changes in hydropower systems and three facing major problems,re?views the theoretical and methodological progress of hydropower in China in the last decade and points outthat China's hydropower research under transformation of energy structure needs to be carried out in the future.
引文
[1] IEA(International Energy Agency). 2018 Renewables information:Overview[Z]. 2018.
    [2] IEA(International Energy Agency). 2018 Electricity information:Overview[Z]. 2018.
    [3] BP. BP Statistical Review of World Energy[Z]. 2018.
    [4] IHA(International Hydropower Association). 2018 Hydropower Status Report[R]. 2018.
    [5]中国电力企业联合会.中国电力行业年度发展报告[R].北京:中国市场出版社,2018.
    [6]国家能源局.水电发展“十三五”规划(2016-2020)[Z].北京:国家能源局,2016.
    [7] YEH W W-G. Reservoir management and operations models:a state-of-the-art review[J]. Water Resources Re?search,1985,21(12):1797-1818.
    [8] WURBS R A. Reservoir-system simulation and optimization models[J]. Journal of Water Resources Planningand Management,1993,119(4):455-472.
    [9] LABADIE J W. Optimal operation of multireservoir systems:State-of-the-art review[J]. Journal of Water Re?sources Planning and Management,ASCE,2004,130(2):93-111.
    [10] CHENG Chuntian,YANG Lingzhi,ALI Mirchi,et al. China’s booming hydropower:Systems modeling chal?lenges and opportunities[J]. Journal of Water Resources Planning and Management,ASCE,2017,143(1):02516002.
    [11] CHENG Chuntian,SHEN Jianjian,WU Xinyu,et al. Operation challenges for fast-growing China’s hydropowersystems and respondence to energy saving and emission reduction[J]. Renewable&Sustainable Energy Reviews,2012,16(5):2386-2393.
    [12]中国电力企业联合会.规划与统计[EB/OL].[2018-08-31]. http://www.cec.org.cn/guihuayutongji/.
    [13] Wikipedia百科[EB/OL]. https://en.wikipedia.org/wiki/List_of_largest_hydroelectric_power_stations
    [14]全国水力资源复查工作领导小组.中华人民共和国水力资源复查成果(2003年)总报告[M].北京:中国电力出版社,2004.
    [15]张勇传.水电能优化管理[M].武汉:华中工学院出版社,1987.
    [16]张勇传.水电系统最优控制[M].武汉:华中理工大学出版社,1993.
    [17]张勇传.水电站经济运行原理[M].北京:中国水利水电出版社,1998.
    [18]董子敖.水库群调度与规划的优化理论和应用[M].济南:山东科学技术出版社,1989.
    [19]叶秉如.水利计算及水资源规划[M].北京:水利电力出版社,1995.
    [20] LOUCKS D P,STEDINGER J R,HAITH D A. Water resource systems planning and analysis[M]. Prentice-Hall,Englewood Cliffs,NJ,560,1981.
    [21] LITTLE J D C. Use of storage water in a hydroelectric system[J]. Oper. Res. Soc. Amer. J.,1955,3(2):187-197.
    [22] MANNOS M. An application of linear programming to efficiency in operation for a system of dams[J]. Economet?rica,1955,33(3):871-880.
    [23] HALL W A,BURAS N. The dynamic programming approach to water resources development[J]. J. Geophys.Res.,1961,66(2):510-520.
    [24] LARSON R. State Increment Dynamic Programming[M]. Elsevier,NewYork,1968.
    [25] HEIDARI M,CHOW V T,KOKOTOVIC P V,et al. Discrete differential dynamic programming approach to wa?ter resources system optimization[J]. Water Resources Research,1971,7(2):273-283.
    [26] LUCAS N J D,PERERA P J. Short-term Hydroelectric scheduling using the progressive optimality algorithm[J]. Water Resources Research,1985,21(9):1456-1458.
    [27] NANDA J,BIJWE P R,KOTHARI D P. Application of progressive optimality algorithm to optimal hydrothermalscheduling considering deterministic and stochastic data[J]. International Journal of Electrical Power&EnergySystems,1986,8(1):61-64.
    [28] TURGEON A. Optimal short-term hydro scheduling from the principle of progressive optimality[J]. Water Re?sources Research,1981,17(3):481-486.
    [29] TURGEON A. A decomposition method for the long-term scheduling of reservoirs in series[J]. Water ResourcesResearch,1981,17(6):1565-1570.
    [30] TURGEON A,CHARBONNEAU R. An aggregation-disaggregation approach to long-term reservoir management[J]. Water Resources Research,1998,34(12):3585-3594.
    [31] REVELLE C,JOERES E,KIRBY W. Linear decision rules in reservoir management and design 1:developmentof the stochastic model[J]. Water Resources Research,1969,5(4):767-777.
    [32] STEDINGER J R,SULE B F,LOUCKS D P. Stochastic dynamic-programming models for reservoir operation op?timization[J]. Water Resources Research,1984,20(11):1499-1505.
    [33] KELMAN J,STEDINGER J R,COOPER L A. Sampling stochastic dynamic-programming applied to reservoiroperation[J]. Water Resources Research,1990,22(4):447-454.
    [34] FABER B A,STEDINGER J R. Reservoir optimization using sampling SDP with ensemble streamflow prediction(ESP)forecasts[J]. Journal of Hydrology,2001,249(1/4):113-133.
    [35] LOUCKS D,DORFMAN P. An evaluation of some linear decision rules in chance-constrained models for reser?voir planning and operation[J]. Water Resources Research,1975,11(6):777-782.
    [36] PEREIRA M V F,PINTO L M V G. Multi-stage stochastic optimization applied to energy planning[J]. Math.Programming,1991,52(2):359-375.
    [37] LUND J R,FERREIRA I. Operating rule optimization for the Missouri River Reservoir System[J]. Journal of Wa?ter Resources Planning and Management,ASCE,1996,122(4):287-295.
    [38] LUND J R,GUZMAN J. Some derived operating rules for reservoirs in series or in parallel[J]. Journal of WaterResources Planning and Management,ASCE,1999,125(3):143-153.
    [39] GRYGIER J C,STEDINGER J R. Algorithms for optimizing hydropower system operation[J]. Water ResourcesResearch,1985,21(1):1-10.
    [40] AMADO S M,RIBEIRO C C. Short-term generation scheduling of hydraulic multi-reservoir multi-area intercon?nected systems[J]. IEEE Transactions on Power System,1987,2(3):758-763.
    [41] ALBERTO Tejada-Guibert,JERY R Stedinger,KONSTANTIN Staschus. Optimization of value of CVP’s hydro?power production[J]. Journal of Water Resources Planning and Management,1990,116(1):52-70.
    [42] KHALIL N,ZADEH,JAIME H VILLADA Z,ANDERS Weibull. Operation planning and control of cascaded hy?dro plants”[J]. IEEE Transactions on Power Systems,1991,6(2):835-861.
    [43] YEH W W G,LEONARD Becker,HUA Shiqian,et al. Optimization of real-time hydrothermal system operation[J]. Journal of Water Resources Planning and Management,1992,118(6):636-653.
    [44] REKUTOWSKI M R,LITWINOWICZ T,FROWD R J. Optimal short-term scheduling for a large-scale cascad?ed hydro system[J]. IEEE Transactions on Power Systems,1994,9(2):805-811.
    [45] ARIS P GEORGAKAKOS,YAO Huaming,YU Yongqing. Control model for hydroelectric energy-value optimiza?tion[J]. Journal of Water Resources Planning and Management,1997,123(1):30-38.
    [46] ZIAD K,SHAWWASH,THOMAS K,et al. The BC hydro short term hydro scheduling optimization model[J].IEEE Transactions on Power Systems,2000,15(3):1125-1131.
    [47] BARROS M T L,TSAI F T C,YANG S L,et al. Optimization of large-scale hydropower system operations[J].Journal of Water Resources Planning and Management,ASCE,2003,129(3):178-188.
    [48]程春田,武新宇,申建建,等.大规模水电站群短期优化调度方法(I)-总体概述[J].水利学报,2011,42(9):1017-1024.
    [49]程春田,申建建,武新宇,等.大规模复杂水电优化调度系统的实用化求解策略及方法[J].水利学报,2012,43(7):785-795.
    [50]申建建,程春田,程雄,等.大型梯级水电站群调度混合非线性优化方法[J].中国科学(技术科学),2014,44(3):306-314.
    [51] WANG Jian,CHENG Chuntian,SHEN Jianjian,et al. Optimization of large-scale daily hydrothermal system op?erations with multiple objectives[J]. Water Resources Research,2018,54(4):2834-2850.
    [52] FENG Zhongkai,NIU Wenjing,CHENG Chuntian,et al. Optimizing hydropower reservoirs operation via an or?thogonal progressive optimality algorithm[J]. Journal of Water Resources Planning and Management-ASCE,2018,144(3). DOI:10. 1061/(ASCE)WR. 1943-5452. 0000882
    [53]武新宇,程春田,王静,等.受送电规模限制下水电长期可吸纳电量最大优化调度模型[J].中国电机工程学报,2011,31(22):8-16.
    [54] WU Xinyu,CHENG Chuntian,SHEN Jianjian,et al. A multi-objective short-term hydropower scheduling mod?el for peak shaving[J]. International Journal of Electrical Power and Energy Systems,2015,68:278-293
    [55]曾筠,武新宇,程春田,等.跨流域水电站群长期优化调度的可变策略搜索求解算法[J].中国电机工程学报,2013,33(28):9-16.
    [56]申建建,程春田,程雄,等.复杂时段耦合型约束水电站群短期变尺度优化调度方法[J].中国电机工程学报,2014,34(1):87-94.
    [57]王嘉阳,程春田,廖胜利,等.复杂约束限制下的梯级水电站群实时优化调度方法及调整策略[J].中国电机工程学报,2015,35(17):4326-4334.
    [58]刘康,武新宇,程春田,等.小水电与大中型水电分区输电限制优化调度模型[J].中国电机工程学报,2016,36(13):3488-3497.
    [59] CHENG Chuntian,SHEN Jianjian,WU Xinyu,et al. Short-term hydro scheduling with discrepant objectives us?ing multi-step progressive optimality algorithm[J]. Journal of the American Water Resources Association,2012,48(3):464-479
    [60] SIMONOVIC S P. Reservoir systems analysis:Closing gap between theory and practice[J]. Journal of Water Re?sources Planning and Management,1992,118(3):262-280.
    [61]冯仲恺,牛文静,程春田,等.水库群联合优化调度知识规则降维方法[J].中国科学(技术科学),2017,47(2):210-220.
    [62]冯仲恺,牛文静,程春田,等.大规模水电系统优化调度降维方法研究Ⅰ:理论分析[J].水利学报,2017,48(2):146-156.
    [63]冯仲恺,牛文静,程春田,等.大规模水电系统优化调度降维方法研究Ⅱ:方法实例[J].水利学报,2017,48(3):270-278.
    [64] ZENG Yun,WU Xinyu,CHENG Chuntian,et al. Chance constrained optimal hedging rules for cascaded hydro?power reservoirs[J]. Journal of Water Resources Planning and Management,ASCE,2014,140(7):04014010.
    [65] WU Xinyu,CHENG Chuntian,ZENG Yun,et al. Centralized versus distributed cooperative operating rules formultiple cascaded hydropower reservoirs[J]. Journal of Water Resources Planning and Management,ASCE,2016,142(11):05016008.
    [66]纪昌明,马皓宇,李传刚,等.基于可行域搜索映射的并行动态规划[J].水利学报,2018,49(6):649-661.
    [67] FENG Zhongkai,NIU Wenjing,CHENG Chuntian,et al. Optimization of hydropower system operation by uni?form dynamic programming[J]. Energy,2017,134:718-730.
    [68] FENG Zhongkai,NIU Wenjing,CHENG Chuntian,et al. Hydropower system operation optimization by discretedifferential dynamic programming based on orthogonal experiment design[J]. Energy,2017,126:720-732.
    [69]程春田,郜晓亚,武新宇,等.梯级水电站长期优化调度的细粒度并行离散微分动态规划方法[J].中国电机工程学报,2011,31(10):26-32.
    [70] CHENG Chuntian,WANG Sen,CHAU Kwokwing,et al. Parallel discrete differential dynamic programming formultireservoir operation[J]. Environmental Modelling and Software,2014,57:152-164.
    [71]牛文静,冯仲恺,程春田,等.梯级水电站群并行多目标优化调度方法[J].水利学报,2017,48(1):104-112.
    [72]周东清,彭世玉,程春田,等.梯级水电站群长期优化调度云计算随机动态规划算法[J].中国电机工程学报,2017,37(12):3437-3446.
    [73]程春田,武新宇,申建建,等.大规模水电站群短期优化调度方法(II)-高水头多振动区问题[J].水利学报,2011,42(10):1168-1176.
    [74]李树山,廖胜利,申建建,等.厂网协调模式下梯级AGC控制策略[J].中国电机工程学报,2014,34(7):1113-1123.
    [75] CHENG Chuntian,SHEN Jianjian,WU Xinyu. Short-term scheduling for large-scale cascaded hydropower sys?tems with multi-vibration zones of high head[J]. Journal of Water Resources Planning and Management,ASCE,2012,138(3):257-267.
    [76] CHENG Chuntian,WANG Jiayang,WU Xinyu. Hydro unit commitment with a head-sensitive reservoir and mul?tiple vibration zones using MILP[J]. IEEE Transactions on Power Systems,2016,31(6):4842-4852.
    [77]王森,武新宇,程春田,等.梯级水电站群长期发电优化调度多核并行机会约束动态规划方法[J].中国电机工程学报,2015,35(10):2417-2427.
    [78] WANG Jian,CHENG Chuntian,WU Xinyu,et al. Optimal hedging for hydropower purpose and carryover stor?age values[J]. Journal of Water Resources Planning and Management,ASCE,2019,145(4):04019003.
    [79]牛文静,申建建,程春田,等.耦合调峰和通航需求的梯级水电站多目标优化调度混合搜索方法[J].中国电机工程学报,2016,36(9):2331-2341.
    [80]牛文静,武新宇,冯仲恺,等.梯级水电站群蓄能控制优化调度方法[J].中国电机工程学报,2017,37(11):3139-3145.
    [81] CHENG Chuntian,WU Huijun,WU Xinyu,et al. Power generation scheduling for integrated large and small hy?dropower plant systems in southwest China[J]. Journal of Water Resources Planning and Management,ASCE,2017,143(8):04017027.
    [82]程春田,励刚,程雄,等.大规模特高压直流水电消纳问题及应用实践[J].中国电机工程学报,2015,35(3):549-560.
    [83]程雄,程春田,申建建,等.大规模跨区特高压直流水电网省两级协调优化方法[J].电力系统自动化,2015,39(1):151-158.
    [84]王嘉阳,申建建,程春田,等.基于负荷重构策略的火电切负荷调峰方法[J].中国电机工程学报,2014,34(16):2684-2691.
    [85] SHEN Jianjian,CHENG Chuntian,WU Xinyu,et al. Optimization of peak loads among multiple provincial pow?er grids under a central dispatching authority[J]. Energy,2014,74:494-505.
    [86]武新宇,程春田,申建建,等.大规模水电站群短期优化调度方法(Ⅲ)——多电网调峰问题[J].水利学报,2014,43(1):31-42.
    [87] XIE M,ZHOU J,LI C,et al. Daily generation scheduling of cascade hydro plants considering peak shaving con?straints[J]. Journal of Water Resources Planning and Management,2015,142(4):04015072.
    [88] LU P,ZHOU J,LI C,et al. Quarter-hourly generation scheduling of hydropower systems considering peak sav?ing demands among multiple provincial power grids in Central China[J]. International Journal of Electrical Ener?gy,2015(3):145-150.
    [89] SHEN Jianjian,CHENG Chuntian,CHENG Xiong,et al. Coordinated operations of large-scale uhvdc hydropow?er and conventional hydro energies about regional power grid[J]. Energy,2016,95:433-446.
    [90]申建建,程春田,程雄,等.跨省送电梯级水电站群调峰调度两阶段搜索方法[J].中国电机工程学报,2014,34(28):4817-4826.
    [91] CHENG ChunTian,CHENG Xiong,SHEN JianJian,et al. Short-term peak shaving operation for multiple powergrids with pumped storage power plants[J]. International Journal of Electrical Power and Energy Systems,2015,67:570-581.
    [92]吴慧军,程春田,武新宇,等.考虑小水电出力不确定性的小水电与大中型水电站群短期联合调度方法[J].中国电机工程学报,2016,36(21):5879-5889.
    [93]刘本希,武新宇,程春田,等.大小水电可消纳电量期望值最大短期协调优化调度模型[J].水利学报,2015,46(12):1497-1505.
    [94]孙永军,李刚,程春田,等.结合加权马尔可夫链与GM(1,1)模型的两阶段小水电群发电能力预测方法[J].中国科学(技术科学),2015,45(12):1279-1288.
    [95]刘本希,廖胜利,冯仲恺,等.耦合偏互信息的贫资料地区小水电发电能力预测[J].电力系统自动化,2015,39(19):149-153.