基于BIM应用的水运工程建设项目造价管理
详细信息    查看全文 | 推荐本文 |
  • 英文篇名:Cost management of waterway engineering project based on BIM application
  • 作者:汪映红 ; 刘代全 ; 刘建华 ; 邹开明 ; 古建宏
  • 英文作者:WANG Ying-hong;LIU Dai-quan;LIU Jian-hua;ZOU Kai-ming;GU Jian-hong;Hunan Provincial Water Transportation Construction & Investment Group Co.,Ltd.;Beijing Zhongjiao Jingwei Highway Cost Technology Co.,Ltd.;School of Traffic and Transportation Engineering,Changsha University of Science and Technology;Guangdong Yunfu to Maoming Expressway Co.,Ltd.;
  • 关键词:水运工程 ; 船闸 ; 造价管理 ; BIM ; 工程量统计
  • 英文关键词:water transport engineering;;ship lock;;cost management;;BIM;;statistics of engineering quantity
  • 中文刊名:SYGC
  • 英文刊名:Port & Waterway Engineering
  • 机构:湖南省水运建设投资集团有限公司;北京中交京纬公路造价技术有限公司;长沙理工大学交通运输工程学院;广东云茂高速公路有限公司;
  • 出版日期:2019-03-04 12:02
  • 出版单位:水运工程
  • 年:2019
  • 期:No.553
  • 基金:湖南省交通运输厅科技进步与创新计划项目(201716);; 广东省交通运输厅科技项目(2016-02-034);; 湖南省普通高等学校重点实验室开放课题(KLDRES003);; 长沙理工大学交通建设教育部重点实验室开放基金资助项目(kfj150201)
  • 语种:中文;
  • 页:SYGC201903038
  • 页数:5
  • CN:03
  • ISSN:11-1871/U
  • 分类号:163-167
摘要
传统水运工程设计中二维图纸无法直观统计工程量和指导施工,而采用BIM技术可以实现设计的协同共享、碰撞检查及工程量统计,其建模过程与BIM模型的信息集成适用于造价管理中的各个阶段。依托湘江二级航道二期工程中大源渡航电枢纽二线船闸开展三维实景及水工建筑物的BIM建模,应用BIM技术复核工程量,使造价师从繁琐的计算工作中解脱出来,对水运工程建设项目造价综合管理具有较大的社会价值。
        The traditional two-dimensional drawings in the water transport engineering design can not realize direct statistics of the engineering quantity and guidance of the construction,but by adopting the BIM technology,we can realize the collaborative sharing, collision check and engineering quantity statistics, and the information integration with the BIM model can be applied to all stages of cost management. Using the BIM technology and modeling in the second-line ship lock in the Dayuandu navigation and hydropower project in the second phase of the Xiangjiang River second-class channel, and reviewing the engineering quantity by the BIM technology, the cost engineers can get rid of the tedious work of the calculation. It has great social value for the comprehensive management of cost of water transport engineering projects.
引文
[1]翟慧娟,李颢,张林江.航电枢纽建设与内河航运发展[J].交通建设与管理,2008(7); 68-72.
    [2]王崇宇,刘虎英.湘江土谷塘航电枢纽船闸设计优化及创新[J].水运工程,2015(1):115-119.
    [3]周作茂.株洲航电枢纽船闸闸首设计[J].水运工程,2007(8):89-92.
    [4]吴信.西江航运干线桂平二线船闸设计关键技术[J].水利水运工程学报,2012(4):108-114.
    [5]朱旭.船闸闸首三维有限元仿真分析[D].重庆:重庆交通大学,2010.
    [6]赵小平. BIM技术在工程设计概预算管理中的应用分析[J].铁路工程造价管理,2015(3):53-55.
    [7] EASTMAN C, TEICHOLZ P, SACKS R, et al. BIM Handbook:A Guide to Building Information Modeling for Owners,Managers,Designers,Engineers and Contractor[M].NewYork:John Wiley and Sons,2008:93-460.
    [8]刘睿,许燕. BIM在工程造价中的应用文献综述[J].项目管理技术,2014(7):34-37.
    [9]薛守贵.基于BIM的全面造价管理实施构想[J].安徽建筑,2014,198(4):257-259.